What it is

A Milestone migration moves your VMS, without losing your footage.

In a Milestone XProtect migration you move the existing environment onto new hardware, a different architecture or a renewed server estate. That often comes up during a refit, when servers reach end of life, or when an environment has outgrown itself. The cameras, the cabling and the recording history stay the starting point. What can be carried across is carried across. What has to be replaced is replaced for a reason.

When a Milestone migration applies:

  • New or heavier hardware, because the current servers are nearing the end of their life.
  • A different architecture, for instance a setup with separate recording and management roles.
  • A move to a new server estate, often tied to a refit on board.

A migration is something other than an upgrade. With a Milestone upgrade the hardware stays put and you move to a newer XProtect version. With a migration the underlying foundation changes. Both call for preparation, but the risks and the work differ fundamentally. If you are unsure which of the two you need, the Health Check makes it clear.

Check first

Our approach, in four steps.

Every engagement at DZT starts with a Health Check. We look first, before anything changes. That way you migrate not on assumptions, but on the basis of what is really there.

1

Read-only review

We map the existing XProtect environment with a read-only Health Check. We look at cameras, retention settings, disks, licences and network. Nothing is touched and everything is recorded.

2

Migration plan and risks

You get a concrete plan with the migration route, what is preserved and what is replaced. Including the risks, the order and the moment something goes briefly offline.

3

Phased migration

We migrate in phases, with retention preserved. The existing footage comes along, the cabling stays where it can and you keep eyes on the system during the cut-over.

4

Handover and assurance

After the migration we check the new environment and hand it over with documentation. Optionally you keep it stable with Care or monitoring through Neryx.

The difference

Migration without DZT versus with DZT.

A server replacement done on instinct costs you time and footage. A guided migration takes that uncertainty away.

Without guidance
  • Downtime nobody had estimated in advance.
  • Cabling pulled again for no good reason.
  • Retention partly lost in the cut-over.
  • Nobody carrying final responsibility when it goes wrong.
With DZT
  • Existing cabling preserved wherever that is technically possible.
  • Retention assured, the recording history comes along.
  • A plan tested up front, carried out in phases.
  • One point of contact who carries the whole migration.
From the field

We do not name our luxury and high-end clients. We show what we do for them.

A refit without pulling the cables again.

During a superyacht refit, with cabling already running throughout the vessel, the Milestone environment faced a move to new hardware. The challenge was not the technology alone, but preserving what had worked well for years. The cabling, the camera positions and the recording history built up over time.

We reviewed the environment read-only first, drew up a migration plan and moved it across in phases, preserving what could be preserved. No needless re-cabling and no gap in the footage.

SituationA refit with a Milestone environment that had to move to new hardware.
ApproachRead-only review, migration plan and phased execution with retention preserved.
ResultCabling preserved, footage carried across and one party responsible for the whole.
FAQ

Common questions about Milestone migration

What is the difference between a migration and an upgrade?

With an upgrade your hardware stays put and you move to a newer XProtect version. With a migration the foundation itself changes: new servers, a different architecture or a new server estate. The Health Check makes clear which of the two applies in your situation.

How much downtime does a migration involve?

That depends on the architecture and the route chosen. By migrating in phases we keep the interruption as short and predictable as possible. The migration plan states per step when something goes offline, so there are no surprises.

Can the existing cabling be preserved?

In many cases, yes. We do not pull cables again if there is no need. What can stay, stays. Only where the existing infrastructure gets in the way of the new setup do we replace it, deliberately and for a reason.

What happens to retention during the migration?

The recording history comes along. We secure retention in the migration plan and move the existing recordings across in phases, so you get no gap in your retention period. You keep eyes on the system during the cut-over.

How long does a Milestone migration take?

The lead time differs per environment and depends on the number of cameras, the volume of recorded footage and the architecture chosen. After the read-only review we give a realistic schedule, before anything is set in motion.